Choose the trigger that matches the asset
A calendar rule fits work due every month. A meter-based rule can fit work tied to operating hours or cycles. A condition or threshold trigger may depend on an integration, sensor or manual reading. These are different requirements, often sold on different plans.
List each critical PM with its asset, trigger, instructions, duration, parts and completion evidence. Decide whether completion resets the next due date or the schedule stays anchored. Test what happens when a job is late, skipped or rescheduled.
What to demonstrate in a pilot
- Create an asset and a recurring PM with realistic instructions.
- Assign the work to the right role and shift.
- Record a reading, a photo, time and a consumed part.
- Fail a checklist item and create the follow-up work.
- Review overdue work without hiding missed tasks.
- Export completion evidence with stable asset identifiers.
Use a safe sample task. The software must not replace equipment-specific procedures or required safety controls.
Read plan limits carefully
Recurring work orders, attached procedures, meter-based scheduling and parts inventory are not interchangeable features. A free plan might cap active PMs; a paid entry plan may still limit procedure attachments. Review the current vendor documentation and ask for written confirmation of your intended configuration.
| Product | Preventive maintenance | Parts inventory | Offline workflow | API |
|---|---|---|---|---|
| MaintainXPublished plans | Essential: unlimited repeating work orders | Premium | Documented mobile offline; confirm entitlement and cached workflow | Premium REST API; integration work is separate |
| LimbleRequest a quote | Standard: unlimited PMs | Premium+ | Premium+; test bookmarked tasks and reconnection | Premium+ REST API |
| UpKeepPublished & quoted plans | Premium | Premium | Professional; documented cache and draft limits | Enterprise API/custom integrations |
| FiixPublished & quoted plans | Free: 25 active PMs; Basic: unlimited | Listed on Free and paid plans | Available; plan and exact workflow need confirmation | Enterprise, additional cost |
What a useful report tells you
Start with overdue work, completion against the agreed schedule, repeat failures and planned labor. Define the numerator, denominator and treatment of cancelled jobs before comparing reports. A dashboard alone does not establish improved reliability or reduced downtime.