A CMMS shortlist for the plant floor.

Start with the maintenance work that affects production. Then verify that the proposed plan supports the assets, shifts, parts and information flows involved.

Model the equipment before the demonstration

Choose one representative line, its major assets and a few maintainable components. Agree how asset IDs, locations and parent-child relationships will be represented. A flat list may suit a small shop; a more complex hierarchy needs a deliberate structure and ownership rules.

Use a planned task, an urgent fault and a parts shortage as three demonstration cases. These expose different needs in scheduling, approvals, handover, purchasing and reporting.

Requirements to put in writing

  • Calendar and meter-based PM triggers, with overdue and rescheduling behavior.
  • Task instructions, measurements, photos and sign-off requirements.
  • Spare-part stock, reservations, replenishment and purchasing responsibilities.
  • Shift handovers and clear ownership of unfinished work.
  • Downtime categories and consistent start/end recording.
  • Role-appropriate access and traceable changes.

Software features do not themselves establish regulatory compliance. Have the responsible team verify any recordkeeping, validation or approval requirements for your operation.

Define the ERP and MES boundary

Decide which system owns assets, parts, purchasing, vendors and production events. “Has an API” is not an implemented integration. Require a scope covering record IDs, sync direction, frequency, errors, retries, support ownership and ongoing costs.

Test a duplicate, a changed part number and a failed sync. Confirm that a maintenance record cannot silently overwrite the financial or production source of truth.

Run a bounded pilot

Pick a representative area with an accountable supervisor and a small set of cleaned asset records. Train requesters and technicians separately. Compare completed work against a checklist, then export a sample with the asset history. Resolve gaps before expanding the rollout.

Use the pilot checklist →

A practical next step

Start with the work your team needs to do.

Compare documented capabilities, identify the questions still open, and send your requirements to Flor for follow-up.